• CIMC-TIANDAJirong has signed the ground air-conditioning project
    Recently, CIMC Group's CIMC-TIANDAJirong Air Refrigeration Co., Ltd. has signed the ground air-conditioning project contract of Hong Kong International Airport’s North Satellite Building.
    MORE
  • CIMC-Tianda has Successfully Bided for Zhengzhou Xin Zheng International Airport
    On 6th, August, 2016, CIMC-Tianda has Successfully Bided for Passenger Boarding Bridges equipment and installation project of T2 Terminal (second extension project) of Zhengzhou Xin Zheng International Airport. The project includes 128 fixed channel, 83 passenger boarding bridges (one A380 PBB included) and PBB monitoring system. It is the largest single number order to CIMC-Tianda thus far.
    MORE
  • A380 Passenger Boarding Bridge of Beijing Capital International Airport
    The world’s biggest passenger plane A380 from Singapore Airlines arrived at Beijing Capital International Airport at 14:50 on 2nd, August, 2008. All 132 Passenger Boarding Bridges of T3 terminal are provided by CIMC-Tianda, including 8 high-lift Passenger Boarding Bridges which are able to serve for F Stand(three bridges pickup)of A380.
    MORE
  • Shenzhen Bao’an International Airport Terminal 3
    Terminal 3 of Shenzhen Bao’an International Airport has formally put into used in 2013, all 75 Passenger Boarding Bridges are provided by CIMC-Tianda.
    MORE
  • ADP Paris Charles de Gaulle Airport
    On 8th, July, 2008, CIMC-Tianda established the cooperation with ADP for the first time. The first batch Passenger Boarding Bridges are running successfully at Terminal 2A and 2B of CDG Airport since 2006 up to now.
    MORE